The HCM City People’s Committee has issued a plan to implement the city's transport infrastructure upgrade project in the 2021-2030 period, which will require investment of VND970.6 trillion (US$42.3 billion).
VOV.VN - A container ship carrying an additional two trains for Ho Chi Minh City’s metro line No. 1 has departed Japan and is scheduled to dock at Khanh Hoi Port in the city’s District 4 on June 20.
VOV.VN - Two trains consisting of three carriages each for the Ho Chi Minh City Metro Line No. 1, which will run from Ben Thanh market to Suoi Tien theme park, arrived at Khanh Hoi Port in the southern city on May 10.
Construction for the first ground floor (B1) at Ba Son station, part of Ho Chi Minh City’s Metro Line No.1 (Ben Thanh – Suoi Tien), was completed one month earlier than the set deadline.
VOV.VN - Two metro trains designed for Ho Chi Minh City’s metro line No1 are due to leave Japan’s Kasado port on May 1 and will arrive at a port in the Vietnamese city on May 9 at the latest.
The completion of Metro Line No 1 project in Ho Chi Minh City linking Ben Thanh Market in District 1 with Suoi Tien Tourist Park in District 9 is likely to be delayed to after 2021, the municipal Management Authority for Urban Railways (MAUR) has stated.
Ho Chi Minh City plans to conduct a test run of the elevated section of metro line No.1 connecting Ben Thanh and Suoi Tien in late 2021 and commercially operate the whole system in 2022.
After two months of transportation and installation, the last component of a tunnel boring machine (TBM) will be placed at the S9 underground station of Metro Line No 3, Nhon - Hanoi Train Station, on December 30.
VOV.VN - Ho Chi Minh City hosted a ceremony on October 13 in order to welcome the arrival of the first set of carriages which will be used on the Metro Line No 1 Ben Thanh-Suoi Tien.
Training of personnel who will operate and manage Ho Chi Minh City’s metro line No 1 has begun, according to the HCM City Urban Railway Company Ltd No 1 (HURC 1).