• VOV1
  • VOV2
  • VOV3
  • VOV4
  • VOV5
  • VOV6
  • VOV GT
  • VTC1 HD
Skip to main content
Home
Listen & Watch
Tiếng Việt

Menu mobile tiếng anh

Politics
Domestic Diplomacy
Economy
Society
Culture
Travel
Places Entertainment
Sports
Photos
Your Vietnam
Politics
Economy
Society
Culture
Travel
Sports
Photos
Your Vietnam

Tag: Metro Line No 1

HCM City requires over US$42 billion for transport infrastructure upgrades
HCM City requires over US$42 billion for transport infrastructure upgrades

The HCM City People’s Committee has issued a plan to implement the city's transport infrastructure upgrade project in the 2021-2030 period, which will require investment of VND970.6 trillion (US$42.3 billion).

HCM City requires over US$42 billion for transport infrastructure upgrades

HCM City requires over US$42 billion for transport infrastructure upgrades

Two more Japanese metro trains due to arrive in Ho Chi Minh City
Two more Japanese metro trains due to arrive in Ho Chi Minh City

VOV.VN - A container ship carrying an additional two trains for Ho Chi Minh City’s metro line No. 1 has departed Japan and is scheduled to dock at Khanh Hoi Port in the city’s District 4 on June 20.

Two more Japanese metro trains due to arrive in Ho Chi Minh City

Two more Japanese metro trains due to arrive in Ho Chi Minh City

Two Japanese trains arrive for City Metro Line No. 1
Two Japanese trains arrive for City Metro Line No. 1

VOV.VN - Two trains consisting of three carriages each for the Ho Chi Minh City Metro Line No. 1, which will run from Ben Thanh market to Suoi Tien theme park, arrived at Khanh Hoi Port in the southern city on May 10.

Two Japanese trains arrive for City Metro Line No. 1

Two Japanese trains arrive for City Metro Line No. 1

Ba Son underground station’s ground floor completed ahead of schedule
Ba Son underground station’s ground floor completed ahead of schedule

Construction for the first ground floor (B1) at Ba Son station, part of Ho Chi Minh City’s Metro Line No.1 (Ben Thanh – Suoi Tien), was completed one month earlier than the set deadline.

Ba Son underground station’s ground floor completed ahead of schedule

Ba Son underground station’s ground floor completed ahead of schedule

Japanese metro trains shipped for HCM City metro line No1
Japanese metro trains shipped for HCM City metro line No1

VOV.VN - Two metro trains designed for Ho Chi Minh City’s metro line No1 are due to leave Japan’s Kasado port on May 1 and will arrive at a port in the Vietnamese city on May 9 at the latest.

Japanese metro trains shipped for HCM City metro line No1

Japanese metro trains shipped for HCM City metro line No1

Metro Line No1 in HCM City likely to be completed after 2021
Metro Line No1 in HCM City likely to be completed after 2021

The completion of Metro Line No 1 project in Ho Chi Minh City linking Ben Thanh Market in District 1 with Suoi Tien Tourist Park in District 9 is likely to be delayed to after 2021, the municipal Management Authority for Urban Railways (MAUR) has stated.

Metro Line No1 in HCM City likely to be completed after 2021

Metro Line No1 in HCM City likely to be completed after 2021

HCM City plans to carry out trial run of elevated section of metro line No.1 in late 2021
HCM City plans to carry out trial run of elevated section of metro line No.1 in late 2021

Ho Chi Minh City plans to conduct a test run of the elevated section of metro line No.1 connecting Ben Thanh and Suoi Tien in late 2021 and commercially operate the whole system in 2022.

HCM City plans to carry out trial run of elevated section of metro line No.1 in late 2021

HCM City plans to carry out trial run of elevated section of metro line No.1 in late 2021

Hanoi: First tunnel boring machine for metro line construction installed
Hanoi: First tunnel boring machine for metro line construction installed

After two months of transportation and installation, the last component of a tunnel boring machine (TBM) will be placed at the S9 underground station of Metro Line No 3, Nhon - Hanoi Train Station, on December 30.

Hanoi: First tunnel boring machine for metro line construction installed

Hanoi: First tunnel boring machine for metro line construction installed

HCM City welcomes first train on Metro Line No 1 Ben Thanh - Suoi Tien
HCM City welcomes first train on Metro Line No 1 Ben Thanh - Suoi Tien

VOV.VN - Ho Chi Minh City hosted a ceremony on October 13 in order to welcome the arrival of the first set of carriages which will be used on the Metro Line No 1 Ben Thanh-Suoi Tien.

HCM City welcomes first train on Metro Line No 1 Ben Thanh - Suoi Tien

HCM City welcomes first train on Metro Line No 1 Ben Thanh - Suoi Tien

Personnel training begins for HCM City’s first metro route
Personnel training begins for HCM City’s first metro route

Training of personnel who will operate and manage Ho Chi Minh City’s metro line No 1 has begun, according to the HCM City Urban Railway Company Ltd No 1 (HURC 1).

Personnel training begins for HCM City’s first metro route

Personnel training begins for HCM City’s first metro route

  • ‹ Prev
  • 1
  • 2
  • 3
  • Next ›

Latest News

Vietnamese porridges listed among world’s top 100 by TasteAtlas
Vietnamese porridges listed among world’s top 100 by TasteAtlas
Tung Duong becomes first Vietnamese artist honoured at Music Awards Japan
Tung Duong becomes first Vietnamese artist honoured at Music Awards Japan
VOV inks cooperation document with Russia’s Orpheus Radio
VOV inks cooperation document with Russia’s Orpheus Radio
Vietnamese athlete earns bronze at 2025 Asian Weightlifting Championships
Vietnamese athlete earns bronze at 2025 Asian Weightlifting Championships
Party General Secretary To Lam’s Russia visit in the spotlight
Party General Secretary To Lam’s Russia visit in the spotlight
Australian tourists increasingly interested in Vietnam: NZ Herald
Australian tourists increasingly interested in Vietnam: NZ Herald
Coach Kim adds more Vietnamese players to ASEAN All-stars squad
Coach Kim adds more Vietnamese players to ASEAN All-stars squad
Heavy rain wreaks havoc across Vietnam, leaving two dead, crops destroyed
Heavy rain wreaks havoc across Vietnam, leaving two dead, crops destroyed
Vietnam women’s futsal team top Group B after goalless draw with Iran
Vietnam women’s futsal team top Group B after goalless draw with Iran
Politics Economy Society Culture
Travel Sports Photos Your Vietnam
Politics
Economy
Society
Culture
Travel
Sports
Photos
Your Vietnam
VOICE OF VIETNAM
VOICE OF VIETNAM

Head office: 37 Ba Trieu, Hoan Kiem, Ha Noi, Viet Nam
Phone: 84-24-22105148 | Fax: 84-24-39344230
Email: toasoanvov.vn@gmail.com | toasoan@vovnews.vn

Contact for Ads: 0903203412, quangcao@vovnews.vn
Báo giá quảng cáo

Editor-in-chief: NGO THIEU PHONG
Deputy Editor-in-chief: Nguyen Tuyet Yen, Pham Cong Han, Dang Thi Khanh
Agency: THE VOICE OF VIETNAM

Chung nhan Tin Nhiem Mang
Giấy phép báo Điện tử VOV số 564/GP-BTTTT của Bộ Thông tin & Truyền thông cấp ngày 13/12/2016