Japanese metro trains shipped for HCM City metro line No1

VOV.VN - Two metro trains designed for Ho Chi Minh City’s metro line No1 are due to leave Japan’s Kasado port on May 1 and will arrive at a port in the Vietnamese city on May 9 at the latest.

These are two out of six metro trains HCM City is importing from Yamaguchi Prefecture-based Kasado Works for its metro line 1 development scheme, according to the municipal Management Authority for Urban Railways (MAUR).

The remaining four trains are set to be shipped to Vietnam in June and July, said the MAUR, adding that following customs clearance, the trains will be taken to Long Binh depot of Thu Duc city.

Japan’s contractor Hitachi will be responsible for the safety, quality as well as transportation costs of the trains.

Previously, the first among 17 trains of metro line No.1 arrived at Khanh Hoi port in HCM City’s District 4 in October 2020.

In the first phase, the MAUR will receive and operate a three-car train capable of carrying 930 passengers and running at a maximum speed of 110 km/h overground and 80 km/h underground.

The first train is expected to be given a trial run on Long Binh depot track by the end of this year at the earliest. After evaluation, the metro train will continue to be tested on the main line.

The six-car train will be tested from Binh Thai station to Van Thanh station for the second phase and from Van Thanh station to Ben Thanh station for the final phase.

The metro line No1 construction project is underway in HCM City, linking Ben Thanh market in District 1 and Suoi Tien Amusement Park in District 9.

The US$2.05 billion line is the first of at least six to be built in the city, aiming to ease traffic congestion in its north-east gateway.

Mời quý độc giả theo dõi VOV.VN trên

Related

Metro Line No1 in HCM City likely to be completed after 2021
Metro Line No1 in HCM City likely to be completed after 2021

The completion of Metro Line No 1 project in Ho Chi Minh City linking Ben Thanh Market in District 1 with Suoi Tien Tourist Park in District 9 is likely to be delayed to after 2021, the municipal Management Authority for Urban Railways (MAUR) has stated.

Metro Line No1 in HCM City likely to be completed after 2021

Metro Line No1 in HCM City likely to be completed after 2021

The completion of Metro Line No 1 project in Ho Chi Minh City linking Ben Thanh Market in District 1 with Suoi Tien Tourist Park in District 9 is likely to be delayed to after 2021, the municipal Management Authority for Urban Railways (MAUR) has stated.