Hanoi Railway Company Limited (Hanoi Metro) has announced that to better meet rising passenger travel demand, especially during peak hours, it will adjust peak-hour time frames and apply new train schedules on both urban railway Line 2A Cat Linh–Ha Dong and Line 3.1 Nhon–Hanoi Station from February 9.
Contractors have so far successfully tunnelled 647m of underground passageways of the Nhon-Hanoi Railway Station urban railway line project.
VOV.VN - With the Cat Linh–Ha Dong metro line being planned to be put into commercial exploitation from November 15, let’s take a closer look at the line ahead of its official operation.
The ninth train of the Hanoi urban railway line No.3 connecting Nhon and Hanoi Station has arrived at the depot in Hanoi, and the 10th, also the last, train is expected to reach Hai Phong port on September 14, the Hanoi Metropolitan Railway Management Board (MRB) said on September 11.
Construction of a 4-km underground section of the Hanoi urban railway line No.3 (Nhon-Hanoi Station) will commence after May 1, with four underground stations from Station 9 in Kim Ma to Station 12 in Hanoi Station.