Panoramic views of Saigon Urban Rail Project

VOV.VN - The Saigon Urban Rail Project is now 70% complete and on target to be placed into service in 2018. In honour of the occasion we have gathered some panoramic photos of pillars and sections of the construction.

View of eight pillars crossing over the Ba Son Shipyard

Pillars spanning Van Thanh (Binh Thanh District) 

Residential areas of Ward 22, Binh Thanh District

Tan Cang Station 

Girder installation work parallel to the Saigon Bridge

Thao Dien station area (Thao Dien Ward, District 2) 

High-rises in District 2

 

Rach Chiec Bridge, District 9 and Thu Duc District

Phuoc Long Station




 

Thu Duc Water Plant

Thu Duc District

High-tech Zone (District 9 and Thu Duc District)

National Highway 1A

Suoi Tien Station

Long Binh Depot (District 9)

Opera House Station and Ba Son (District 1) 

Chart metro Ben Thanh - Suoi Tien Photo: Google Maps

Mời quý độc giả theo dõi VOV.VN trên

Related

HCM City wishes for hastened construction of metro railway No.1
HCM City wishes for hastened construction of metro railway No.1

Vice Chairman of the Ho Chi Minh City People’s Committee Le Thanh Liem has pledged all possible support for foreign investors, especially those from Japan.

HCM City wishes for hastened construction of metro railway No.1

HCM City wishes for hastened construction of metro railway No.1

Vice Chairman of the Ho Chi Minh City People’s Committee Le Thanh Liem has pledged all possible support for foreign investors, especially those from Japan.