Te Giac Trang oil field reaches production milestone of 100 million barrels

Te Giac Trang (White Rhino) oil field has officially reached a production milestone of 100 million barrels of crude.

The field is situated in Block 16-1, about 100km southeast of the southern Vung Tau City.

Its commercial development was announced in September 2009.

The new milestone has turned its operator – the Hoang Long - Hoan Vu Joint Operating Company (HLJOC) - into one of the five oil companies on the Vietnamese continental shelf making such record.

The HLJOC was established by PetroVietnam Supervision Company (PVSC), SOCO Vietnam Ltd. (SOCO), Amerada Hess Vietnam Ltd. (HESS), and OPECO Vietnam Ltd. (OPECO).

By now, the company’s total revenue has reached US$8.3 billion, contributing more than US$2.8 billion to the state budget.

Mời quý độc giả theo dõi VOV.VN trên

Related

First flow of gas pumped out of Su Tu Trang oil field in phase 2A
First flow of gas pumped out of Su Tu Trang oil field in phase 2A

The Oil and Gas Group (PetroVietnam) on June 18 welcomed the first flow of gas from Su Tu Trang (White Lion) oil field in phase 2A.

First flow of gas pumped out of Su Tu Trang oil field in phase 2A

First flow of gas pumped out of Su Tu Trang oil field in phase 2A

The Oil and Gas Group (PetroVietnam) on June 18 welcomed the first flow of gas from Su Tu Trang (White Lion) oil field in phase 2A.

Vietsovpetro welcomes first oil flow from Bach Ho field’s BK-20 rig
Vietsovpetro welcomes first oil flow from Bach Ho field’s BK-20 rig

The Vietnam - Russia oil and gas joint venture (Vietsovpetro) has welcomed the first flow of commercial oil from the BK-20 rig belonging to the Bach Ho field.

Vietsovpetro welcomes first oil flow from Bach Ho field’s BK-20 rig

Vietsovpetro welcomes first oil flow from Bach Ho field’s BK-20 rig

The Vietnam - Russia oil and gas joint venture (Vietsovpetro) has welcomed the first flow of commercial oil from the BK-20 rig belonging to the Bach Ho field.