Dai Hung - Phase 3 project produces first commercial oil flow

The Phase 3 of the Dai Hung field development project (Dai Hung - Phase 3) has officially begun production of its first oil flow with 6,000 barrels per day – 20 days ahead of the adjusted schedule, according to the Vietnam National Industry - Energy Group (Petrovietnam).

This marks a highly significant event coinciding with the 50th founding anniversary of the group.

In October 2003, the Government gave Petrovietnam the direct authority to carry out petroleum operations at the Dai Hung oil field (located in Block 05-1(a), within the Nam Con Son Basin on the southern continental shelf of Vietnam, approximately 265 km southeast of Vung Tau city, with water depths ranging from 110 to 120 meters), following the withdrawal of an international contractor consortium after assessing the field as economically unviable.

By the end of April 2025, the field had produced nearly 75 million barrels of oil, making a significant contribution to national revenue, generating employment for thousands of workers over the years, and playing a role in safeguarding national sovereignty and security.

On June 23, 2022, the Prime Minister approved the Field Development Plan (FDP) for the Dai Hung - Phase 3 project.

The project plays a pivotal role in maintaining production levels at this field, enhancing the recovery factor, and increasing economic efficiency. At the same time, it opens up opportunities for continued exploration and expansion within Block 05-1(a) and adjacent blocks - a long-term strategy aimed at ensuring national energy security and safeguarding maritime sovereignty.

Mời quý độc giả theo dõi VOV.VN trên
Viết bình luận

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Related

Petrovietnam aims for over US$39 billion in 2024 revenue
Petrovietnam aims for over US$39 billion in 2024 revenue

The Vietnam Oil and Gas Group (Petrovietnam) is taking strong measures to earn VND1 quadrillion (US$39.4 billion) in revenue this year.

Petrovietnam aims for over US$39 billion in 2024 revenue

Petrovietnam aims for over US$39 billion in 2024 revenue

The Vietnam Oil and Gas Group (Petrovietnam) is taking strong measures to earn VND1 quadrillion (US$39.4 billion) in revenue this year.